Bonga FPSO

Summary Information

  • Name: Bonga FPSO
  • Field: Bonga Oil And Gas Field
  • Country: Nigeria
  • Ownership:
  • Website:
  • Field Operated By: Shell
  • Capacity: 225,000 bpd
  • Year of Completion:

Brief Description

  • The FPSO, measures over 300 metres long, 75 metres wide and 33 metres tall. The Bonga FPSO can extract and process up to 225,000 barrels of oil a day and store up to 2 million barrels of oil. It also has a gas export facility of 150 million standard cubic feet per day


  • AMEC: FPSO Engineering Procurement Construction contract
  • Samsung Heavy Industries(SHI): FPSO hull construction
  • Heerema: EPCI for 7 Topsides Modules
  • ABB: Electrical Systems


  • In operation


  • 2001 - AMEC was awarded the Engineering Procurement Construction contract
  • 2002 - FPSO Bonga leaves SHI yard in Korea
  • 2003 - The Bonga FPSO sets sail for Nigeria

Other Information

  • -


  1. Bonga FPSO Topsides
  2. Samsung FPSO References
  3. International Protective Coatings FPSO References
  4. ABB FPSO References
  5. SHI constructs world's largest FPSO facility
  6. Nigerian Bound Bonga Hailed a Major Success for AMEC

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License