Bonaparte LNG Terminal
Related Pages
LNG Terminals in Australia
GDF Suez LNG Terminals
Santos LNG Terminals
LNG News
For More LNG News
LNG Blog Entries
Summary Information
- Ownership: Santos, GDF SUEZ
- Website: http://www.santos.com/
- Location: Bonaparte Basin, Australia
- Capacity: 2.0 million tons/annum
- Status: Planned
Brief Description
- A floating LNG liquifaction Terminal
Technical Details
- Storage capacity:
- Constructor:
- Contracts have been awarded for pre-Front End Engineering and Design (pre-FEED), to Granherne (upstream) and DORIS Engineering (midstream)
- KBR: Floating liquefied natural gas (FLNG) production vessel design work
- Tractebel: Concept selection for offshore facilities (upstream & midstream), site selection, Assistance to Owner for Pre-FEED studies supervision for FLNG, specification for metocean survey campaign for FEED
Ongoing Projects/Project Status
- Contracts have been awarded for pre-Front End Engineering and Design (pre-FEED), to Granherne (upstream) and DORIS Engineering (midstream)
- Final investment decison is not expected until 2014
- Completion planned for 2018
Suppliers / Customers
- Suppliers: Gas will be supplied by the Petrel, Tern and Frigate Gas Fields located in the Bonaparte basin in the Timor Sea off the north coast of Australia.
- Customers:
History
- 2010 - GDF SUEZ signed with Santos the final agreement for the purchase of a 60% share in three offshore gas fields
- 2010 - Contracts have been awarded for pre-Front End Engineering and Design (pre-FEED)
- 2011 - First appraisal drilling
- 2012 - Environmental approval awarded
- 2012 - KBR selected for floating liquefied natural gas (FLNG) production vessel design work
- 2014 - FLNG decision review announced
Other Information
- -
Relevant Links
- Tractebel Engineering LNG References
- Santos and GDF SUEZ announce strategic partnership in Australia
- Pre-FEED contracts awarded for Bonaparte LNG
- Appraisal drilling gets underway for Bonaparte LNG
- GDF SUEZ launches the Bonaparte LNG project in Australia
- Floating LNG facility receives environmental approval
- KBR to Execute FLNG Production Vessel Design Work for GDF SUEZ
- Wood Group Kenny wins FLNG subsea project
- Santos and GDF SUEZ to review alternative development concepts for Bonaparte LNG
page revision: 17, last edited: 14 Aug 2014 11:32