Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Oil & Gas Processing Topside Module
■ Topside Modules, Living Quarters, Flare Tower & Bridge on 3 Artificial Islands
Client:CITIC Oil
Location:Offshore Bohai Bay, P.R. China
Description:
·Facilities Construction for 3 Artificial Islands·Main
Scope of Work::
·Detail design (excluding process design)
·Procurement
·Construction & installation
·Mechanical completion
·Commissioning & trial operation
- Liwan 3 1 Gas Field
- China
- South Sea of China
- Husky/Cameron
- Liwan 3-1 MEG Module
- Engineering, Onshore construction, Vessels Installation, Electrical Equipment Installation & Wiring Connection& Project management
- P 58 FPSO
- Brazil
- Parque Das Baleias Oil Field
- QUIP
- Piping prefabrication for the FPSO P58
- Engineering ·Procurement ·Onshore construction ·Project management ·Load-out
- Cidade De Sao Paulo MV23 FPSO
- Brazil
- Sapinhoa Guara Oil Field
- Petrobras
- Pancake Modules
- Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
- P 63 FPSO
- Brazil
- Papa Terra Oil Field
- Petrobras
- Heating & Cooling Module (M82)
- Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
- P 63 FPSO
- Brazil
- Papa Terra Oil Field
- Petrobras
- Project Utilities Module (M81)
- Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
- Cidade De Sao Paulo MV23 FPSO
- Brazil
- Sapinhoa Guara Oil Field - Brazil
- Petrobras
- MV23 SRU Module, Size (L×W×H): 34,3mm×19,23mm, Weight: 650 tons, Main Material: Carbon Steel
- Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
- Cidade De Sao Paulo MV23 FPSO
- Brazil
- Sapinhoa Guara Oil Field - Brazil
- Petrobras
- MV23 Chemical Injection Module - Size (L×W×H): 17m×23.5m×12m, Weight: 362 tons, Main Material: Carbon Steel
- Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
- Cidade De Sao Paulo MV23 FPSO
- Brazil
- Sapinhoa Guara Oil Field - Brazil
- Petrobras
- MV23 Gas Turbine Generator Module - Size (L×W×H): 24.3m×25.5m×14m, Weight: 497 tons, Main Material: Carbon Steel
- Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
- Cidade De Angra Dos Reis MV22 FPSO
- Brazil
- Lula Oil Field
- PETROBRAS/MODEC/Aker
- Seawater Treatment Module
- Size (L×W): 26m×20m, 600 tons, Main Material: Carbon Steel, Stainless Steel, Duplex & Super Duplex
- ·Engineering (excluding process design), Procurement, Onshore construction & pre-commissioning, Load-out
- Dynamic Producer FPSO
- Brazil
- PETROBRAS/Prosafe/Petreco
- Crude Oil Separator Module
- 2 Pressure Vessel Modules (Separation, Stabilization & Produced Water Treatment Module), 3 Floors - Size (L×W×H): 18.92m×18.02m×19.925m, Weight: 1152 tons, Main Material: Carbon Steel
- Scope of Work: Engineering (excluding process design), Procurement, Construction, Project management
- Cidade De Sao Mateus FPSO
- M10 & M62 Modules
- Client:PETROBRAS/Prosafe/Petreco
- Location:Offshore Brazil, South America
- Description:
- M10 & M62 Separator & Water Treatment Modules
- M10: Size (L×W×H): 27m×19m×19m, Weight: 780 tons, Main Material: Carbon Steel,
- M62: Size (L×W×H): 25m×18m×20m, Weight: 800 tons, Main Material: Carbon Steel
- Scope of Work::Engineering (excluding process design), Procurement ·Onshore construction, Pre-commissioning, Load-out, Project management, etc.
- Cidade De Niteroi MV18 FPSO
- MEG Module
- Client:PETROBRAS/MODEC/Petreco
- Location:Offshore Brazil, South America
- Description:MEG Reclamation Treatment Module, Size (L×W×H): 14m×8m×16.3m, Total Weight: 310 tons, Main Material: Carbon Steel
- Scope of Work: Engineering(excluding process design), Procurement, Onshore construction, Pre-commissioning, Load-out, Project management,etc.
Living Quarters Modules
- Suizhong 36-1 Oil Field
- SZ 36-1 Living Quarters 100POB & 30 POB
- Client:CNOOC
- Location:Bohai Bay, P.R. China
- Description:
- 100 POB, Size (L×W×H): 33m X 12m X 19.5m, Total Weight: 1246 tons, Main Material: Carbon Steel,
- 30 POB, Size (L×W×H): 23m X 10.5m X 12.5m, Total Weight: 657 tons, Main Material: Carbon Steel
- Scope of Work:Engineering, Detail design, Procurement, Onshore construction, Fabrication design, Load-out
- Al Khafji Oil Field
- Khafji Crude Related Offshore Projects Cellar Deck, LQ & Bridge
- Client:Khafji Joint Operation
- Location:Offshore Khafji, the Middle East
- Description:Cellar Deck, Weight: 650 tons, LQ: 4 Floors + Helideck, Weight: 2,900 tons, Accommodation: 69 persons, Bridge: Weight: 40 tons, Main Material: Carbon Steel
- Scope of Work:Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
- Cheng Dao Xi Oil Field
- DPB Platform Living Quarter
- Client:Noble Energy
- Location:Shan Dong, P.R. China
- 3 Floors, Size (L×W×H): 20m×11 m×11m, Weight: 560 tons, Accommodation: 56 persons, Main Material: Carbon Steel
- Scope of Work:Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
- Suizhong 36-1 Oil Field
- I/ LD5-2 Oil Field CEPK Living Quarter
- Client:CNOOC
- Location:Tanggu, Tianjin, P.R. China
- Description:4 Floors ﹢ Helideck, Size (L×W×H): 30m×11.5 m×13m, Weight: 1200 tons, Accommodation: 100 persons, Main Material: Carbon Steel,
- Scope of Work:Detail design, Fabrication design, Material procurement, Fabrication, Erection, Testing, Pre-commissioning, Overall project management, Technical support for offshore installation, hook-up, and commissioning
- Lvda Offshore Oil And Gas Field
- Lv Da WHPA & WHPB Living Quarter
- Client:CNOOC
- Location:Bohai Bay, China
- Description:
- WHPA LQ (100-man): 5 Floors ﹢ Helideck, Size (L×W×H): 25m×13m×18.5m, Weight: 1012 tons, Accommodation: 100 persons
- WHPB LQ (30-man): 3 Floors ﹢ Helideck, Size (L×W×H): 23m×11.5m×11.5m, Weight: 502 tons, Accommodation: 30 persons
- Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
- Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPE LQ
- Client:ConocoPhillips China Ltd.
- Location:Bohai Bay, P.R. China
- Description:5 Floors ﹢ Helideck, Size (L×W×H): 44.5m×23m×26.08m, Weight: 1520 tons, Accommodation: 100 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
- Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPF LQ
- Client:ConocoPhillips China Ltd.
- Location:Bohai Bay, P.R. China
- Description:3 Floors ﹢ Helideck, Size (L×W×H): 60m×24m×21m, Weight: 1487 tons, Accommodation: 100 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Fabrication design, Engineering, procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
- Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPD LQ
- Client:ConocoPhillips China Ltd.
- Location:Bohai Bay, P.R. China
- Description:5 Floors ﹢ Helideck, Size (L×W×H): 49m×35.5m×23m, Weight: 1390 tons, Accommodation: 100 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
- Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPB LQ
- Client:ConocoPhillips China Ltd.
- Location:Bohai Bay, P.R. China
- Description:·6 Floors ﹢ Helideck, Size (L×W×H): 62m×35m×26m, Weight: 2003 tons, Accommodation: 100 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore, Construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
■ Pemex Mexico Bay Two LQ
Client:China Oilfield Service Limited (COSL)
Location:Gulf of Mexico
Description:
·2 Living Quarters
·4 Floors ﹢ Helideck
·Size: 35 m×14 m
·Weight: 672 tons (for Each)
·Accommodation: 80 persons
·Main Material: Carbon Steel
Scope of Work:
·Fabrication Design
·Procurement
·Onshore Construction
·Inspection
·Pre-commissioning
·Load-out
·Overall Project Management & Control
- Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPC LQ
- Client:ConocoPhillips China Ltd.
- Location:Bohai Bay, P.R. China
- Description:3 Floors ﹢ Helideck, Size (L×W×H): 49m×35.5m×23m, Weight: 1210 tons, Accommodation: 70 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
- Suizhong 36-1 Oil Field
- SZ36-1 Oil Field Phase I B Area LQ
- Client:CNOOC
- Location:Bohai Bay, P.R. China
- Description:3 Floors ﹢ Helideck
- Size (L×W×H): 23m×10m×10m, Weight: 550 tons, Accommodation: 47 persons
- Main Material: Carbon Steel
- Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
- Qikou 18-1 Oil Field
- Bohai Bay, P.R. China
- CNOOC
- Two LQ Modules - 3 Floors ﹢ Helideck
- QK18-1/LQ: Size (L×W×H): 23m×10m×10m, Weight: 610 tons, Accommodation: 54 persons
- QK17-3/LQ: Size: 21m×10m×10m, Weight: 570 tons, Accommodation: 47 persons
- Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
- Qikou 17-2 Oil Field
- QK17-2 Oil Field LQ
- Client:CNOOC
- Location:Bohai Bay, P.R. China
- Description:3 Floors ﹢ Helideck
- Size (L×W×H): 23m×10.5m×10m
- Weight: 650 tons
- Accommodation: 51 persons
- Main Material: Carbon Steel
- Scope of Work:Fabrication design, Engineering Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
- Zhao Dong Oil Field
- Zhao Dong Oil Field LQ
- Apache
- Bohai Bay, P.R. China
- Description: 4 Floors ﹢ Helideck, Size (L×W×H): 32m×13.5m×16m, Weight: 1200 tons, Accommodation: 132 persons, Main Material: Carbon Steel
- Scope of Work:Detail design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
- Penglai 19-3 Oil Field
- PL19-3 Oil Field Phase I Development Project WHPA LQ
- Client:ConocoPhillips China Inc.
- Location:Bohai Bay, P.R. China
- Description:
- Size (L×W×H): 15m×12.5m×10m
- ·Weight Limitation: 139 tons
- Final Weighing: 127 tons
- Accommodation: 50 persons
- Main Material: 316LS.S. & Aluminum
- Scope of Work:
- Fabrication design
- Engineering
- Procurement
- Onshore construction
- Offshore commissioning