Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Topside Modules
- Forties Oil Field
- Artificial Lift Consortium/BP
- Artificial Lift - 2 Deep Gas Injection Process Modules. 90 Tonnes each 12m x 8m x 8m each
- Forties Oil Field
- BP
- Forties/Unity Platform - Riser Platform Topsides. Deck Structure, 2,500 Tonnes. 40m x 30m x 19m
- Greater Alwyn Oil And Gas Fields
- Total Oil
- Dunbar- Alwyn/Subsea
- Separator Module. 420 Tonnes. 17m x 10m x 11m
- Brent Oil Field
- Shell
- Brent Charlie/LTFD
- Engineering Procurement and Construction of Drilling Module Working within Joint Venture Framework with Bentec Gmbh, 1,200 Tonnes. Plan Area 23m x 19m. Overall Height 57m
- Alba Oil Field
- Brown & Root/AOC
- Coalescer/Degasser Module
- Schiehallion FPSO
- SBM Inc
- Fabrication of Upper Turret for FPSO Including Duplex Process Pipework
- Forties Pipeline System
- BP
- Hound Point MVRP Topsides
- Bruce Oil And Gas Field
- BP
- Bruce Phase II
- EPC Contract for Compression Platform Topsides and Bridge. Weight; 3,000 Te Approx
- Schiehallion FPSO
- BP Amoco
- Schiehallion Hex Replacement Module
- BP Amoco BP Grangemouth Process Module
- Millom And Dalton Gas Fields
- Burlington Resources
- Millom West
- EPIC Contract for Sea Nova Platform.
- Weight; Topsides 350 Te, Legs 454 Te, Concrete Base 3,000 Te
- Nexen Buzzard Wellhead Deck 4000T
- Armada Oil And Gas Field
- United Kingdom
- AMEC
- BG
- Maria - Separator Module
- Rev Gas And Condensate Field
- Norway
- AMEC / BG
- Rev Project - Provision of Topsides Module
- Valhall Oil Field
- BP
- Valhall Solids Handling Module
PAUs / PARs
Client Location Project Description
Artificial Lift Consortium/BP BP Forties/Artificial Lift 2 Deep Gas Injection Process Modules. 90 Tonnes each 12m x 8m x 8m each
- Alba Oil Field
- Brown & Root/AOC
- Coalescer/Degasser Module
- Schiehallion FPSO
- BP Amoco
- Schiehallion - Hex Replacement Module
BP Amoco BP Grangemouth Process Module
- Clair Oil Field
- BP
- Clair - Skids/Compression Module
- Britannia Gas Field
- ConocoPhillips
- Britannia Phase 2 Skids/LER
- Maria Oil Field
- AMEC
- BG
- Maria Separator Module
CB & I South Hook Fabrication of PARs
AMEC / BG Rev Project Provision of Topsides Module
- Valhall Oil Field
- BP
- Valhall Skid Units / PAUs
- Valhall Oil Field
- BP
- Valhall Solids Handling Module
Accommodation & LERs
- Alba Oil Field
- Chevron UK Limited
- Living Quarters (144 man) and Helideck. 2,000 Tonnes. 36m x 17m x 17.5m.
- Brent Oil Field
- Shell
- Brent/LTFD EPC Project.
- Bravo Replacement Living Quarters. 76 Man Accommodation and Helideck
- Douglas Oil Field
- Hamilton Oil Company
- Douglas Field/Morecambe Flame Conversion
- Complete Conversion, Design and Manufacturing of Existing Jack-Up Drilling Vessel to Accommodation (60 Man) and Utilities Platform Incorporating Field Control Module.
- 240 Tonnes. 74M x 61m.
- Brent Oil Field
- Shell
- Brent Field/LTFD - Charlie Replacement Living Quarters.
- EPC Project 72 Man Accommodation and Helideck. 1,400 Tonnes. 39m x 12m x 21m
- Armada Oil And Gas Field
- British Gas
- Engineering, Procurement and Construction of 44 Man Living Quarters and Helideck.
- Overall Dimensions 17m x 12m.
- Ekofisk Oil Field
- Phillips
- Ekofisk II - Engineering, Procurement and Construction of 100T 2 Storey Office Modules
- Brent Oil Field
- Shell
- Brent Delta - Conceptual Design and Detailed Design of 94 Man Replacement Living Quarters and Helideck Engineering, Procurement and Construction for Single Lift. Overall Dimensions 36m x 17m.
- Bleo Holm FPSO
- Bluewater
- FPSO Bleo Holm - Design and Manufacture of a 90 Man Living Quarters
- Jotun A FPSO
- Kvaerner
- Jotun Living quarters
- Schiehallion FPSO
- BP
- Schiehallion FPSO - LQ Module
- Mad Dog Oil Field
- MD Totco
- Mad Dog - Design and Project Management for Local Equipment Room / Drillers Control Cabin
- Kizomba Oil And Gas Field
- MD Totco
- Kizomba 'B' - Design / Fab of Local Equipment Room / Drillers Control Cabin.
- MD Totco Sakhalin Island Design for Local Instrument Room / Drillers Control Cabin
- Britannia Gas Field
- ConocoPhillips
- Britannia Phase 2
- EPC contract for LER
- CB & I South Hook EPC contract for Jetty Control Building
- Judy
- ConocoPhillips
- EPC contract for Accommodation Unit