Related Pages
Oil Services News
For More Oil Services News
Most Recently Updated Pages
Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
2012
- Greater Alwyn Oil And Gas Fields
- United Kingdom
- TOTAL
- Ellon & Grant Nuggets Well Restart
- 2012
- Lochranza Oil Field
- United Kingdom
- Maersk
- Lochranza & IRM
- 2012
- Athena Oil Field
- United Kingdom
- Ithaca Energy,
- Athena Field Development
- 2012
- Eider Oil Field
- United Kingdom
- TAQA,
- Otter IRM
- Montrose Arbroath Oil And Gas Field
- United Kingdom
- Talisman
- Arkwright Riser Replacement Project
- Ettrick Oil And Gas Field
- United Kingdom
- Nexen
- Ettrick IRM
- Caister Murdoch Gas Fields
- United Kingdom
- E-On
- Hunter Flowline Isolation
- Ninian Oil Field
- United Kingdom
- CNR
- Lyell
- Janice Oil Field
- United Kingdom
- Maersk
- Janice Riser Reconfiguration
- Petrojarl Banff FPSO
- United Kingdom
- Teekay
- Banff & Kyle valve isolation and umbilical preservation
- Thames Gas Field
- United Kingdom
- Perenco
- Arthur
- Gryphon FPSO
- United Kingdom
- Maerk
- Gryphon, area re-instatement programme.
- Fife, Fergus, Flora And Angus Oil Fields
- United Kingdom
- HESS
- FFFA Decommissioning
- Breagh A Gas Field
- United Kingdom
- Allseas
- Breagh "A" Development
- Fairfield Energy,IRM 2012
- Apache Forties
- ConocoPhillips M10 Tie-Ins
- E-On Huntington / Johnston K
2011
- NGC Neo Tie-Ins
- Apache Forties Flex Re-Route Bravo
- Maersk Olie Og COMB, Svend
- Perenco Welland & Inde Remedial Works
- Perenco NW Bell
- TOTAL Islay
- Apache Forties Charlie - ROV inspection
- Apache Forties PL PUP Piece Recovery
- Maerks Gryphon Repair
- Fairfield IRM Merlin / Dunlin
2010
- KNOC valve operations
- PTSC Pearl IRM operations
- PTSC Topaz IRM operations
- Maersk Oil UK Gryphon - phase 1
- ExxonMobil Beryl IRM and decommissioning
- Maersk Oil UK Gryphon - phase 2
- CNR Ninian south platform jacket repair (nepsus hyperbaric welding)
- Hudson Oil Field
- United Kingdom
- Acergy/Dana
- Hudson well tie in and testing
- PetroCanada well W6 connection tie in and testing
- Fairfield P3 IRM works - phase 1
- Silverstone Tristan valve and decommissioning
- Maersk Oil UK Gryphon GP3 subsea IRM scope DC2 retagging and Lochranza change out
- Fairfield IRM - phase 2
- Don Area Oil Fields
- United Kingdom
- Enquest
- Don tie ins - phase 1
- 2010
- Fairfield Osprey P8 well remedial works
- Perenco Wellend/Granby/Tristan IRM
- Don Area Oil Fields
- United Kingdom
- Enquest
- Don tie ins - phase 2 and 3
- 2010
2009
- BP Immortelle construction works offshore Trinidad
- Nexen Ettrick well tie ins and FPSO installation prep (2 phases)
- Total Jura area tie ins
- Eon Rhurgas Rita well methanol flushing
- Helicopter recovery
- Apache NS Forties area flexible flowline installation and tie ins
- Maersk Denmark full Danish North Sea IRM campaign
- Centrica SNS IRM programme
- CNR Nepsys wet welding repairs to Ninian platform brace
- Fairfield Dunlin/Osprey area IRM
- BP Vietnam IRM programme
- ExxonMobil Beryl area and Linnie decommissioning work and seasonal IRM
- Saxon Oil Field
- Petro-Canada
- Saxon SA well tie ins
- Talisman – Full North Sea 365 day DSV support with Bibby Sapphire
2008
- Shell L9 construction project
- Savonette Gas Field
- Trinidad
- BP
- Construction works offshore
- BP Noel calm buoy installation offshore Trinidad
- Saipem/Maersk Halfdan spool installation and testing
- Technip/Apache Forties tie ins
- Technip/Oilexco Brenda tie ins
- Fairfield Dunlin area IRM
- Talisman – wage caisson riser installation (PM and Engineering)
- Talisman – full North Sea 365 day DSV support with Bibby Sapphire works including:
- Buchan Oil Field
- United Kingdom
- Talisman
- Buchan Umbilical replacement
- Tartan Oil Field
- United Kingdom
- Tartan/Highlander Spool installation & tie ins
- SCM/Choke and change out at Ross and Tweedsmuir
- Flexible change out & recovery
- Tartan Oil Field
- United Kingdom
- 13km Power cable installation at Tartan
2007
- Acergy – project support with Bibby Sapphire (120 days)
- Petro-Canada – Saxon project – EPIC subsea construction
- Shamrock And Caravel Offshore Gas Fields
- United Kingdom
- Shell
- Caravel/L9 – subsea construction project
- Talisman – full North Sea DSV support with Bibby Sapphire including:
- Umbilical replacement & J tube pull ins
- Spool installation & tie Ins
- Pipeline dewatering
- Well testing, methanol flushing & diagnostics
- SCM/Choke & accumulator change out
- Flexible change out & recovery
2006
OTSL/Caldive – BP Cannonball Trinidad – spool installation and tie-ins
OTSL/Caldive/Stolt – BG/NGC – pipeline repair
ExxonMobil Arthur 3 flexible and UMB lay/trench and tie-ins
Centrica SNS annual IRM
Nexan – IRM
Talisman – Claymore UMB replacement and hook-up. Flex. Jumper installation
Maersk (Denmark) Bi-annual diving based IRM – up to 30 worksites
ConocoPhillips – Tethys Field tie-in
2005
PetroCanada Guillemott/Clapham IRM
- Tiffany Oil Field
- CNR
- Toni, Thelma and Glamis subsea intervention works
Saipem Tullow Horne and Wren subsea tie-ins
Total North Sea Asset IRM programme (Ph 1)
ExxonMobil LP6 tie-ins
ConocoPhillips SNS pipeline U/T Works
Technip/Shell Corrib structure installation
- Tiffany Oil Field
- CNR
- Toni well conversation to gas lift
Total IRM (Ph 2)
- Kittiwake Oil Field
- Subsea 7/Venture
- Kittiwake SAL inspection
MOD Tornado jet wreckage recovery
- Johnston Gas Field
- Technip – Caledonia
- Johnston tie-ins
2004
- BP/Gupco, Egypt pipeline repair programme
- ENI/Kerr McGee/Talisman UWG wellhead decommissioning
- Forties Oil Field
- Apache/Clough
- Forties Echo riser/subsea construction
- Camelot Gas Fields
- ExxonMobil
- Camelot East riser prep works
- Piper Oil Field
- Talisman
- Piper/Saltire bundle repair & maintenance
- Balmoral Oil Field
- Talisman
- Beauly flexible flowline recovery
- Balmoral Oil Field
- ENI
- Stirling bypass works
- Ross And Blake Oil Fields
- BG
- Blake wellhead repairs
- Beryl Oil Field
- ExxonMobil
- Nevis Central Lewis tie-ins
- Beryl Oil Field
- ExxonMobil
- Buckland “C” Development
- EPIC