Barrancabermeja Refinery Upgrade Project
rating: 0+x

Related Pages

Refineries in Colombia

Ecopetrol Refineries

Refinery News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Refinery\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Refinery News

Refining Blog Entries

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary: The upgrade will enable the Barrancabermeja refinery to produce gasoline and diesel in compliance with international environmental regulations regarding sulphur content reduction.
  • Main Contractors:
    • Technip - front end design, detailed engineering and procurement services for the process units, as well as supervision of contractors’ activities for engineering, procurement and construction (EPC).
    • Foster Wheeler - additional project management consultancy (PMC) and front end engineering design (FEED), detailed engineering for the crude unit revamps, assisting Ecopetrol in the selection process for engineering, procurement and construction (EPC) contracts, and control and supervision of the EPC and construction contractors.

Refining Units

  • 19,000 barrels per stream day (BPSD) gasoline hydrodesulphurization unit - Axens
  • 57,000 BPSD diesel hydrodesulphurization unit - Axens
  • 19,000 million standard cubic feet per day hydrogen production unit -Technip KTI
  • 55 tons/day sulphur recovery unit
  • 110 tons/day tail gas treatment unit
  • 500 gallons per minute (GPM) sour water stripper
  • 30 GPM diesel/gasoline amine regeneration unit.

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • A greater quantity of heavy crudes will be able to be processed
  • They will be sourced domestically

Products Produced

  • Gasoline with fewer than 300 parts per million (ppm) of sulfur
  • Diesel with less than 50 ppm of sulfur

History

  • 2011 - Eximbank awarded $1 Billion worth of loans to the project
  • 2011 - The Board of Directors of Ecopetrol made the final investment decision

Other Information

  • The project was completed in September 2010

Relevant Links