Summary Information
- Source:
- Destination: Ust-Luga, Russian Baltic Sea Coast
- Ownership: Transneft
- Website: http://www.transneft.ru/
- Length: kilometres ( miles)
- Capacity: 600,000 barrels of oil per day
- Crude Type: Ural Crude Oil
The Route
- Route of the pipeline passes through the territory of Bryansk, Smolensk, Tver, Novgorod and Leningrad regions
- A branch pipeline also supplies the Surgutneftegas Kirishi Refinery
Pipeline Status
- In operation
History
- 2011 - Constructiopn completed and line filling began
- 2012 - The First Test Party of Russian Oil Dispatched
- 2012 - Ust-Luga Port Opens Oil Transshipment Terminal
Other Information
- -
Links
- Project Webpage
- At the BTS-2 completed all construction and commissioning
- The First Test Party of Russian Oil Dispatched from Ust'-Luga under BPS-2 Project
- Ust-Luga Port Opens Oil Transshipment Terminal