Arzew LNG Terminal
Summary Information
- Also known as the Gassi Touil LNG Terminal
- Ownership: Sonatrach
- Website: http://www.sonatrach-dz.com/
- Location: Arzew, Algeria
- Capacity: 4.7 million tons/annum
- Status: Under Construction
Technical Details
- Storage capacity: 2 LNG x 160,000 cu.m each
- Constructor: Saipem / Chiyoda
- Licensor:
History
- 1965 - First cargo loaded
- 2006 - Repsol & Sonatrach sign agreement to develop terminal
- 2007 - Sonatrach takes over the project
- 2008 - Sonatrach awarded Saipem/Snamprogetti, in a joint venture with Chiyoda, the lump sum turn key contract encompassing the EPC (engineering, procurement and construction)
Ongoing Projects/Project Status
- The terminal is expected to be completed in 2013
Suppliers / Customers
- Suppliers: Gas is to be supplied by the Gassi Touil Gas Field and Rhourde Nouss Gas Field
- Customers:
Other Information
- -
Relevant Links
- Saipem LNG References
- Saipem wins 2.8 billion euro contract in Algeria entering the LNG sector
- Algeria sees two LNG units onstream in 2012, 2013
- GDF SUEZ: 50th anniversary of the first LNG commercial chain between Algeria and France
page revision: 16, last edited: 06 Apr 2015 16:29