Armada Sterling FPSO

Related Pages

Asia FPSOs

Bumi Armada FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • The Armada Sterling FPSO / Armada D1 FPSO will have 50,000 barrels processing capacity, 580,000 barrels storage capacity, and equipped with an internal turret designed for monsoon conditions prevalent at the field. The Design life of the FPSO is 15 years.

Contractors

  • Keppel: FPSO conversion
  • Dyna-Mac: fabrication of topside modules
  • ABB: Electrical Systems

Status

  • In operation

History

  • 2011 - Bumi Armada Signs 7 Year FPSO Contract With ONGC
  • 2012 - The vessel leaves the shipyard

Other Information

  • -

Links

  1. Keppel FPSO References
  2. Dyna-Mac Topsides Module Business
  3. ABB FPSO References
  4. Bumi Armada Signs 7 Year FPSO Contract With ONGC
  5. Dyna-Mac secures new fabrication orders for a provisional sum of S$115 million
  6. Bumi Armada And Shapoorji Pallonji Company Limited Bids Bon Voyage To FPSO Armada Sterling, Set For Mumbai, India

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License