Armada Cabaca FPSO

Related Pages

Angola FPSOs

Armada FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • The FPSO, which will have a storage capacity of 1,700,000 barrels, will be able to handle up to 80,000 barrels of oil per day (bopd), 120,000 barrels per day (bpd) of water injection, and 120 million standard cubic feet per day (MMscfd) of gas handling
  • The vessel is to be named the Armada Olombendo FPSO

Contractors

  • Bumi Armada: Supply and operation of FPSO
  • Keppel: FPSO conversion including refurbishment and life extension works, upgrading of living quarters to accommodate 100 personnel, installation and integration of an external turret mooring system and topside process modules
  • Dyna-Mac: Construction of 6 units of FPSO topsides modules
  • ABB: Electrification and automation systems

Status

  • Under construction

History

  • 2014 - Bumi Armada awarded FPSO contract

Other Information

  • -

Links

  1. Bumi Armada Signs FPSO Contract With ENI For The Chartering, Operations And Maintenance For Block 15/06, Angola
  2. Keppel secures S$153 million in contracts from repeat customers
  3. Dyna-Mac Secures S$60 Million Topside Module Fabrication Works From Armada Cabaca Ltd
  4. ABB to provide power and automation solutions for new Angolan oil field

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License