Anglia Gas Field

Related Pages

UK Oil & Gas Fields

Ithaca Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Ithaca
  • Country: United Kingdom
  • Location: Blocks 48/18b, 48/19b and 48/19e
  • Production start: 1991
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • BiFab: Subsea Tie-In Anglia Pipeline. Subsea Pipeline Spool with Piggy Back Pipeline
  • FoundOcean: Anglia Pipeline Support
  • J P Kenny: Anglia 'B' Development - Conceptual study of field development options.

History

  • 1990 - Field development approval granted
  • 1991 - First gas produced
  • 1998 - Petrobras acquired a stake from Santos
  • 2010 - Ithaca acquired a 30% stake from GDF Suez

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. FoundOcean Subsea References
  5. BiFab Subsea References
  6. J P Kenny Subsea References
  7. Offers Sought for Oil and Gas Interests in United Kingdom
  8. Ithaca Energy Acquires North Sea Assets from GDF Suez

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License