Amethyst Gas Field
Related Pages
UK Oil & Gas Fields
Perenco Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Perenco
- Country: UK
- Location: Southern North Sea
- Production start: 1990
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field consists of Amethyst East & Amethyst West, with each section having two unmanned platforms. The platforms are A1D, A2D, B1D & C1D
- Amethyst Gas Field acts as a hub for a number of satellites including the Rose Field and Helvellyn Gas Field
- Gas is transported by subsea pipeline to the Easington Gas Processing Terminal
Contractors
- UIE: B1-D & C1-D Platforms
- Heerema: A1D and A2D Platforms
- Stolt Offshore: Pipelines
- NOS: Amethyst A1D and A2D Platform Cable Supports
History
- 1988 - Field development approval awarded
- 1990 - First gas produced
- 2001 - Rose gas field discovered
- 2003 - Development approval given for Rose
- 2004 - First gas from Rose field
- 2009 - BP acquired BG Groups stake
- 2012 - Perenco acquired the field from BP
Geology
- The reservoir sands are from the prolific Rotliegendes Leman sandstone
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- FoundOcean Subsea References
- BG Group Announces New Gas Discovery In Southern North Sea
- Centrica produces first gas from Rose field
- BG Group completes UK North Sea asset exchange with BP
- BP Agrees Sale of Southern Gas Assets to Perenco
page revision: 9, last edited: 11 Aug 2015 08:02