Al Jurf Oil Field

Related Pages

Libya Oil & Gas Fields

Total Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Total
  • Country: Libya
  • Location: Offshore Block 137
  • Production start: 2003
  • Partners: Wintershall (12.5%) NOC (50%)
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The Al Jurf field development consists of the BD-1 wellhead platform with 10 production wells connected to a floating production storage offloading (FPSO) vessel, Farwah FPSO.
  • The FPSO has a storage capacity of more than 900,000 barrels. Production will be 40,000 barrels of oil per day once the field reaches plateau

Contractors

  • Saipem: Wellhead platform and flowlines - FEED
  • Tecon: Basic and detailed structural design of the 8 leg drilling and production deck for BD1 platform
  • Cantieri Rosetti: BD 1 - Jacket
  • Seaway Heavy Lifting: BD-1 Platform installation

History

  • 2002 - BD-1 Platform installed
  • 2003 - Production starts

Geology

Links

  1. Saipem Fixed Offshore Production Facilities Engineering Refe
  2. FoundOcean Africa Subsea References
  3. Jotun Platform References
  4. Tecon Platform References
  5. Libya's Offshore Al Jurf Field in Block C 137 Starts Production

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License