Ahdab Oil Field

Related Pages

Iraq Oil & Gas Fields

CNPC Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: CNPC
  • Country: Iraq
  • Location: 180 kilometers southeast to Iraq's capital city of Bagdad
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Al-Ahdab Oilfield is located 180 kilometers southwest to Baghdad, with a structural area of 200 square kilometers.

Contractors

  • China Petroleum Engineering & Construction Corporation: Construction of Oil Treatment Plants

Geology

History

  • 2008 - CNPC Signs contract to develop field
  • 2009 - Seismic exploration and drilling operation were deployed
  • 2011 - Production starts
  • 2012 - CNPC puts into operation the entire gas processing system

Other Information

  • As stipulated in the contract, CNPC will apply advanced development technologies to meet the benchmarks of 25,000 barrels/day of oil within the first three years and 115,000 barrels/day of oil by the end of sixth year.

Links

  1. CNPC in Iraq
  2. The first phase of Iraq's Al-Ahdab Oilfield starts operation ahead of schedule
  3. CNPC inks oilfield development contract with Iraq
  4. Al-Ahdab Project with Crude Oil Productivity of 6 million t/a Put into Operation 36 days in Advance
  5. CNPC puts into operation the entire gas processing system at Iraq’s Al-Ahdab Oilfield

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License