Adria LNG Terminal
rating: 0+x

Summary Information

  • Ownership: Adria LNG, E-on, OMV, Total
  • Website: http://www.adria-lng.hr/
  • Location: Croatia
  • Capacity: 10 billion cubic metres (bcm) per annum
  • Status: Planned

Brief Description

  • Final capacity of the terminal corresponds to 10 billion Ncbm/year. The terminal facility comprises : a LNG carrier berthing, unloading facilities, full containment storage tanks (3 x 120.000 cbm), vaporisation and transportation facilities

Technical Details

  • Storage capacity:
  • Unloading capacity: It will be designed for LNG tankers carrying up to 265,000 cubic metres.
  • Send out capacity:
  • Constructor:
    • Tractabel: Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications

Ongoing Projects/Project Status

  • Final investment decision is yet to be made
  • The Croatian government is considering their own competing project

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 1993 - Tractabel awarded contract for Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications
  • 2007 - Conceptual engineering study prepared
  • 2009 - Sofregaz awarded FEED contract

Other Information

  • -

Relevant Links

  1. Tractebel Engineering LNG References
  2. Croatia wants concrete moves on LNG terminal
  3. Total Studies an LNG Receiving Terminal in Croatia
  4. Krk Island - CROATIA - LNG TERMINAL - FEED

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License